Central Shopfitters won the tender for this Hotter Shoes project in Salisbury. The store closed for four weeks while we carried out the work, which included upgrading the electrical systems, installing alcove units, a new cash desk and new timber wall shelf units, new flooring, decoration throughout and new shopfront signage.
Project at a glance
- Client: Hotter Shoes
- Location: Salisbury, Wiltshire
- Project: Store fit-out
- Programme: Four weeks (store closed)
- How we were appointed: Competitive tender
- Delivered by: Central Shopfitters, Nottingham
What we delivered
- Upgrade of the electrical systems
- Alcove units installed
- A new cash desk
- New timber wall shelf units
- New flooring
- Decoration throughout
- New shopfront signage








About the project
Salisbury is a historic cathedral city in Wiltshire with a busy city-centre shopping area. A four-week closure meant every trade had to be lined up in advance so the store could reopen on time.
We have delivered the same Hotter design at several stores across England.
More Hotter Shoes projects
- Hotter Shoes St Albans: Store Fit-Out
- Hotter Shoes Trentham: Store Fit-Out
- Hotter Shoes Cirencester: Store Fit-Out from Shell
- Hotter Shoes Solihull: Award-Winning Store Refit
Related services
- Shopfitting and store fit-outs, from single stores to multi-site roll-outs
- Bespoke joinery: counters, fixtures and feature panels
- Design services: surveys, layouts and drawings
Planning a similar project? Call our shopfitting team on 0115 942 2671 or send us your enquiry. You can also browse all of our shopfitting projects.


Central Shopfitters
Central Fire Solutions
Central Shop Maintenance