Central Shopfitters won the tender for this Hotter Shoes project at Trentham Gardens, near Stoke-on-Trent. The store closed for four weeks while we carried out the work, which included upgrading the electrical systems, installing alcove units, a new cash desk and new timber wall shelf units, new flooring, decoration throughout and new shopfront signage.
Project at a glance
- Client: Hotter Shoes
- Location: Trentham, near Stoke-on-Trent, Staffordshire
- Project: Store fit-out
- Programme: Four weeks (store closed)
- How we were appointed: Competitive tender
- Delivered by: Central Shopfitters, Nottingham
What we delivered
- Upgrade of the electrical systems
- Alcove units installed
- A new cash desk
- New timber wall shelf units
- New flooring
- Decoration throughout
- New shopfront signage




About the project
Trentham, on the edge of Stoke-on-Trent in Staffordshire, is a popular shopping and leisure destination. As with every Hotter store we fit out, the full scope was planned around a short, fixed closure so the store could reopen on time.
It is an easy run from our Nottingham base, and one of several Hotter stores we have fitted out to the same design.
More Hotter Shoes projects
- Hotter Shoes St Albans: Store Fit-Out
- Hotter Shoes Cirencester: Store Fit-Out from Shell
- Hotter Shoes Salisbury: Store Fit-Out
- Hotter Shoes Solihull: Award-Winning Store Refit
Related services
- Shopfitting and store fit-outs, from single stores to multi-site roll-outs
- Bespoke joinery: counters, fixtures and feature panels
- Design services: surveys, layouts and drawings
Planning a similar project? Call our shopfitting team on 0115 942 2671 or send us your enquiry. You can also browse all of our shopfitting projects.


Central Shopfitters
Central Fire Solutions
Central Shop Maintenance